Security rooms We plan and implement data – Basic protection or high-MBTF protection centers – Extendible for data centers Whether you are planning a new build, an – Dismantling and reassembly = extension or an optimization to your data center, investment protection we are at your side as a trustworthy partner and – Dust- and noise-reduced installation leading provider with decades of experience. – System-tested – Multi-functional risk coverage High- Basic protection Conventional MTBF Criteria Standards design2) LER LER LSR Extend Basic Extend Testing of the following standards as System testing 1) – complete system or structure ECB·S certifications to EN 1047-2, 50 K temperature increase and 85% rel. humidity up to 24 hours (reheating – – – period), 60 minutes flame impingement time 50 K temperature rise and 85% rel. humidity over 30 – – minutes, without reheat period F120 as system test, according to the limits of EN Fire protection 1363 (DIN 4102), for the cellular structure and its – – – Testing at built-in modules temperatures of up F90 as system test, according to the limits of EN 1363 to 1000°C and above (DIN 4102), for the cellular structure and its built-in – modules F180 only as component testing to EN 1363 – – – (DIN 4102), wall system only F120 only as component testing to EN 1363 (DIN 4102), wall system only F90 only as component testing to EN 1363 (DIN 4102), wall system only Detonation test as system testing of 200 kg TNT from Explosion – – – 40 m Standing water, 72 hours, 40 cm, maximum 20 drops – – – Extinguisher water, IP x 6 as system testing to IEC 60 – 529, for the cellular structure and its built-in modules Water Relative humidity, 85%, over 24 hours (reheat period), – – – 60 minutes flame impingement time, to EN 1047-2 Relative humidity, 85%, over 30 minutes – – IP 5x as system testing to IEC 60 529, for the cellular Dust-tightness – structure and its built-in modules Corrosive fire gases Acrid gas-tightness, based on EN 1634-3 (DIN 18095) – WK 3 as system test to EN 1627/1630, for the cellular structure and its built-in modules, such as doors – Unauthorized WK 2 as system test to EN 1627/1630, for the cellular – access structure and its built-in modules, such as doors WK 4 only as component testing to EN 1627/ DIN – – – 1630, door system only Shock test as system test,3 shocks of 200 kg from 1.5 – – – m after 45 minutes flame impingement time Falling debris Shock test as system test,1 shock of 200 kg from 1.5 – m after 30 minutes flame impingement time Protection against high-frequency irradiation and EMC protection radiation, verified by tests on comparable – components by TU Aachen EMC optional Extended high-frequency shielding in accordance – – – package with BSI TL-03304 1) System-tested products are tested as a complete construction. This comprises the cellular structure and installation modules such as doors, cable shields or ventilation units. By contrast, component testing only refers to individual parts. The conventional design refers to room structures of plasterboard, concrete and other standard construction materials which do 2) not offer sufficient protection for data center applications. Conventional designs are generally tested for use as fire walls. Rittal Catalog 33/IT infrastructure 509
rittal
To see the actual publication please follow the link above